Cooperative Bank York

Project Overview

  • Project Name :

    The Cooperative Bank York
  • Location :

    Feasegate, York
  • Area :

    Circa 150m2
  • Client :

    Concept Group (Wigan) Ltd
  • System Manufacturer :

    Polyroof
  • Completion Date :

    20th January
  • Contract Value :

    Circa £40,000

Background Of The Project

The old asphalt roof had been experiencing leaks for several years and following many failed patch repairs the Cooperative hierarchy sought a final solution for the roof.

Description Of Works Carried Out

Allard Construction Ltd carried out a full thermal upgrade to the old asphalt roof. The roof was repaired, cut, sealed and then overlaid with 120mm RES Insulation and Polyroof Protec Liquids which is a hybrid polymer roofing system. Particular attention to the details were given ensuring that the old defective upstands where removed and the new upstands and terminations finished 150mm above the new insulation level, with all parapets ‘boxed out’ with timber to eradicate the existing water ingress issues at these junctions.

Challenges Faced

The scaffolding was constructed at the front of the store therefore a licence was obtained. Due to the location of the bank all deliveries had to arrive prior to 10am due to the high level of activity on the pedestrianised street.

Solution

We ensured that all deliveries arrived at 7am so they could be hoisted to the roof safely upon immediate arrival.
  • Head Office:
    Units 13-15, Maple Park, Essex Road, Hoddesdon, Hertfordshire, EN11 0EX
    Tel: 01992 463090 Fax: 01992 440798
Other information

Registered Office : Unit 13, Maple Park, Essex Road, Hoddesdon, Hertfordshire. EN11 0EX | Registered in England and Wales: 00587057 | VAT No: 213 5564 82 | Directors: JD Sullivan SA Sullivan AP Chapman

Contact Us
  • Fax:
    01992 440798
  • Email:

    This email address is being protected from spambots. You need JavaScript enabled to view it.


Copyright 2018 Allard Construction Limited.