Case Studies

Please see below case studies of works carried out by Allard Construction Ltd.

Acton Gardens Case Study

Hockerill College

Allard Construction Ltd were appointed by Borras Construction to carry out the waterproofing works to a new build project in Hertfordshire.
Acton Gardens Case Study

Acton Gardens

Allard Construction Ltd worked on behalf of Countryside Properties. Roofing works were carried out to 9 different blocks, inclusive of waterproofing, Brown Roofs and roof finishes. 

30 Cleveland Street

Allard Construction Ltd were appointed by Interserve Ltd/Paragon to carry out the waterproofing works at 30 Cleveland Street in London. The project consisted of both new build and refurbishment works to the 1930’s building.

222 Upper Street

Allard Construction Ltd were employed by Islington Council to install 15-year warranted liquid waterproofing system which was laid on top of the existing asphalt.

Cooperative Bank York

Allard Construction Ltd were appointed by Concept Group Ltd where we carried out a full thermal upgrade to the old asphalt roof, working alongside Polyroof.

Marlborough Science Academy

For this project, Allard Construction worked on behalf of Make Consulting Ltd who work directly with the secondary school. We resurfaced two original tennis and netball courts with a tarmac surface including both the painting of new lines and full replacement of the existing wire fence. 

County Upper School

Allard Construction were appointed by Surveyors 2 Education. We installed a cold applied 25 year warranted system. Coinciding with the waterproofing works, we upgraded the building and in turn improved the energy efficiency by introducing a new flat board insulation system. 

40 Whitfield Street

Allard Construction Ltd worked on behalf of EA Group who were acting as a direct consultant for the commercial building 40 Whitfield Street. Allard Construction Ltd installed a 20 year warranted liquid waterproofing system.

Alderman Jacobs Primary School

Allard Construction Ltd. were appointed as Principal Contractor for Alderman Jacobs Primary School. We installed a 25 year waterproofing system and replaced all existing rooflights.

  • Head Office:
    Units 13-15, Maple Park, Essex Road, Hoddesdon, Hertfordshire, EN11 0EX
    Tel: 01992 463090 Fax: 01992 440798
Other information

Registered Office : Unit 13, Maple Park, Essex Road, Hoddesdon, Hertfordshire. EN11 0EX | Registered in England and Wales: 00587057 | VAT No: 213 5564 82 | Directors: JD Sullivan SA Sullivan AP Chapman

Contact Us
  • Fax:
    01992 440798
  • Email:

    This email address is being protected from spambots. You need JavaScript enabled to view it.


Copyright 2018 Allard Construction Limited.